Home > Port
 

Contents

Pre Arrival:  Overview | Location | Charts | Documents   ...
Communications:  Pre-Arrival | VHF
Berthing Ops:  Tugs | Mooring
Cargo:  Hoses | Cargo
Pollution:  Ballast | Pollution | Waste | Slops
Facilities:  Medical | Water | Fuel | Chandlery | Services   ...
Security:  Fire | Regs
Local Info:  Weather
Shore:  Airport
Crew:  Leave | Repatriation
Misc:  Authority

Summary

Max. Size:  Crude:  350,000 d.w.t.
Airport:  Cuidad del Carmen Domestic, 115 km. Campeche Int'l, 202 km.
Yuum Kak Naab
Flag of Mexico
View weather forecast

MXYKN

OVERVIEW:  Currently the world's largest FPSO, 360,000 d.w. tonnes, LOA 340 m., beam 65.0 m moulded depth 31.5 m. and draft 23.2 m. FPSO ``Yuum Kak Naab'' has crude oil storage capacity 2,200,000 bbls. Daily production capacity 600,000 bbls./day. The terminal is operated by BW Offshore AS for Pemex Exploration and Production (PEP).
LOCATION:  In the Bay of Campeche, Gulf of Mexico, 12.8 n.m. SW of the FSO ``Ta'Kuntah'', 208.9°(T) × 38.4 n.m from the Cayo Arcas Terminal and 64 n.m. offshore in depth 90 m.
YKN FPSO is located on a radius of 5.33 n.m. from Ku'H Platform. Export tanker shall have capability to perform manoeuvring required to approach and depart the FPSO within an area not greater than radius 800 m. (2,624 ft.) from the installation at speed not exceeding 3.0 knots. FPSO may require evidence of a tanker's capability to approach and enter the safety zone. The…