Home > Port
 

Contents

Pre Arrival:  Overview | Location | Charts | Limits   ...
Arrival:  Approaches | Pilotage | Anchorages
Communications:  Pre-Arrival | VHF | VTS/Radar
Berthing Ops:  Tugs | Berths | Mooring
Cargo:  Tankers | LPG | LNG
Pollution:  Ballast | Pollution | Waste | Slops
Facilities:  Medical | Water | Fuel | Drydock | Repairs
Crew:  Leave
Misc:  Authority

Summary

Max. Size:  Products:  160,000 d.w.t., LOA 250 m., draft 14.0 m. Gas:  Displacement 180,000 tonnes, LOA 356 m., draft 13.0 m.
Fuel:  Available.
Airport:  Istanbul Int'l, 100 km.
Medical:  Facilities available.
Marmara Ereglisi
Flag of Turkiye
View weather forecast

TRMAR

OVERVIEW:  The port comprises the BOTAS, Butangaz, OPET, Likit Port and POAS terminals and handles the import of LNG, LPG and petroleum products
LOCATION:  On the north shore of the Sea of Marmara, 36 km. east of Tekirdag and 90 km. west of Istanbul.
CHARTS:  Digital: TR300293, TR502932 and TR52931B.
Paper: BA 224 and 1005.
US 55040, 55042 and 55045.
Publications:  NP24, Black Sea and Sea of Azov Pilot.
PORT LIMITS:  Defined by lines connecting the following positions:
  1. 40° 58.20′ N, 027° 52.00′ E
  2. 40° 57.00′ N, 027° 52.00′ E
  3. 40° 57.00′ N, 028° 00.00′ E
  4. 41° 01.60′ N, 028° 00.00′ E
DOCUMENTS:  See `` General – Documents'' before first Turkey port.
ISPS COMPLIANCE:  Terminals are compliant.
MAX. SIZE:  Products:  160,000 d.w.t., LOA 250 m., draft 14.0 m.
Gas:  Displacement 180,000 tonnes, LOA 356 m., draft 13.0 m.
RESTRICTIONS:  See `` Tanker Facilities'', `` LNG Facilities'' and