Home > Port
 

Contents

Pre Arrival:  Overview | Location | Charts | Documents   ...
Arrival:  Approaches | Pilotage | Anchorages
Communications:  Pratique | Pre-Arrival | VHF
Berthing Ops:  Tugs | Berths
Cargo:  Bulk | Other | Tankers | Cranes | Stevedores   ...
Pollution:  Ballast
Facilities:  Medical | Water | Fuel | Drydock
Security:  Police etc | Security
Local Info:  Weather
Crew:  Repatriation
Report:  Report

Summary

Max. Size:  Channel:  21,000 d.w.t., beam 23.0 m., draft 6.5 m. (tidal). Breakbulk:  LOA 150 m., draft 10.0 m. (tidal). Tankers:  LOA 150 m., draft 10.0 m. (tidal). Crude:  100,000 d.w.t., LOA 250 m., depth 30.0 m.
Fuel:  By barge.
Airport:  Tumaco Domestic, 4 km.

COTCO

OVERVIEW:  Comprises berthing facilities for general and dry and liquid bulk cargoes in the commercial port area on Morro Island (El Morrito), and an offshore oil terminal (CBM) for the export of crude oil
LOCATION:  On the Pacific coast close to the Ecuador border. The commercial port is located on El Morrito area of Tumaco city, and the offshore oil terminal located approx. 1 n.m. off the coast.
CHARTS:  Digital: CO300310, CO400517 and CO500770.
Paper: US 22082, 22083 and 808981.
Publications:  NP7, South America Pilot Vol 3.
DOCUMENTS:  See `` General - Documents'' before first Colombia port.
ISPS COMPLIANCE:  Port and terminal compliant.
PFSO:  Planta Ecopetrol. Eduardo Martinez and Jorge Restrepo. Tel/ Fax: +57 (2) 727 2312. [email protected] [email protected]
Sociedad Portuaria Regional de Tumaco SA. Julio Nixon Padilla Casanova. Tel: +57 (2) 727 2457. Fax: +57 (2) 727 2457. [email protected]
MAX. SIZE:  Channel:  21,000 d.w.t., beam 23.0 m., draft