Home > Port
 

Contents

Pre Arrival:  Overview | Location | Charts | ISPS | Max. Size   ...
Communications:  Pre-Arrival | VHF
Berthing Ops:  Tugs | Mooring
Cargo:  Hoses | Cargo
Pollution:  Ballast | Pollution | Waste
Facilities:  Medical | Water | Fuel | Services | Drydock   ...
Security:  Emergency
Local Info:  Weather
Shore:  Airport
Misc:  Authority | Agent
Report:  Report

Summary

Max. Size:  Crude:  150,000 d.w.t.
Airport:  Vung Tau Domestic, 140 km. Ho Chi Minh Int'l, 200 km.
Su Tu Den Terminal
Flag of Viet Nam
View weather forecast

VNSTD

OVERVIEW:  Offshore terminal comprising the FPSO Thai Binh Vn, a central processing platform and 7 unmanned wellhead platforms (WHP)
There are 3 subsea pipeline end manifolds (PLEM), 3 subsea electrical power cables and control system, infield pipelines and gas export pipelines. Partially separated gas and oil water is piped through the infield and flexible risers to FPSO for final processing before export. Crude oil is stored and offloaded from the FPSO. Associated gas is exported ashore through 16 in. subsea pipeline.The partly separated gas and oil-water is piped through the infield and flexible risers to the FPSO for final processing before export.
LOCATION:  In Block 15-1 of the Cuu Long Basin offshore Vietnam, 100 n.m. SE of Ho Chi Minh City.
CHARTS:  Digital: C1317101, VN320059 and VN320059.
Paper: BA 3987.
US 93020.
Publications:  NP30, China Sea Pilot Vol 1.
ISPS COMPLIANCE:  Terminal is compliant.
MAX. SIZE:  Crude:  150,000 d.w.t.
For…