Home > Port
 

Contents

Pre Arrival:  Overview | Location | Charts | Limits   ...
Arrival:  Approaches | Pilotage | Anchorages
Communications:  Pratique | Pre-Arrival | VHF | VTS/Radar
Berthing Ops:  Tugs | Berths | Mooring
Cargo:  Tankers | Gas | Hoses | Cargo
Pollution:  Ballast | Waste | Slops
Facilities:  Medical | Water | Drydock | Repairs
Security:  Security
Local Info:  Weather
Crew:  Leave | Repatriation

Summary

Max. Size:  Crude:  LOA 249 m., depth 17.1 m. Products:  LOA 249 m., depth 17.1 m. Gas:  LOA 249 m., depth 17.1 m.
Airport:  Batumi Int'l, 105 km. Tbilisi Int'l, 380 km.
Repairs/Drydocks:  Minor repairs possible.
Medical:  Facilities available.

GEKUL

Also see General before first Georgia port
OVERVIEW:  A small river port handling crude, petroleum products and LPG. The terminal is operated by Black Sea Terminal Ltd., a subsidiary of the State Oil Company of Azerbaijan (SOCAR).
LOCATION:  At the mouth of the Khobi River on the eastern shore of the Black Sea, 14 km. north of Poti and 265 km. WNW of Tbilisi.
CHARTS:  Digital: GB403313, GE310300, GE310300, GE510420 and GE610405.
Paper: BA 3313.
US 55170.
Publications:  NP24, Black Sea and Sea of Azov Pilot.
PORT LIMITS:  Defined by a line connecting the following positions:
  1. 42° 17.10′ N, 041° 37.80′ E
  2. 42° 17.10′ N, 041° 36.40′ E
  3. 42° 16.00′ N, 041° 36.40′ E
  4. 42° 16.00′ N, 041° 38.20′ E.
DOCUMENTS:  Contact Agent at earliest opportunity to receive latest document submission guidance All documents should be received by the port not less than 24 hours before arrival. Full details of