Home > Port
 

Contents

Pre Arrival:  Overview | Location | Limits | ISPS | Max. Size   ...
Arrival:  Approaches | Pilotage | Anchorages
Communications:  Pre-Arrival | VHF
Berthing Ops:  Tugs | Berths | Mooring
Cargo:  Gas | Hoses
Facilities:  Medical | Chandlery | Drydock | Surveyors
Shore:  Airport
Crew:  Repatriation
Misc:  Authority

Summary

Max. Size:  Gas:  160,000 cu.m., LOA 300 m., draft 11.7 m.
Airport:  Alexandria (HBE) 45 km.
Medical:  Facilities available.

EGIKU

Also known as Edco
OVERVIEW:  LNG terminal. Handles vessels with range of 40,000–160,000 cu.m.
LOCATION:  On Egypt's Mediterranean coast, 22 n.m. NE of Alexandria in Abu Qir Bay.
PORT LIMITS:  Terminal is bounded by the following positions:
  1. 31° 24.78′ N, 030° 15.74′ E
  2. 31° 21.83′ N, 030° 19.19′ E
  3. 31° 20.80′ N, 030° 18.42′ E
  4. 31° 23.73′ N, 030° 15.02′ E
ISPS COMPLIANCE:  Terminal is compliant.
MAX. SIZE:  Gas:  160,000 cu.m., LOA 300 m., draft 11.7 m.
APPROACHES:  Approach channel 2.5 n.m. × 230 m. dredged to 14.0 m. (CD). Breakwater length 800 m, width 8.0 m. and height 7.5 m. (CD), aligned 027–207°(T) to protect the jetty area from the prevailing NW wind.
PILOTAGE:  Compulsory for all vessels, except port craft, military and coastguard vessels and any other vessel exempted by the port authority. Available throughout 24 hours.
Boarding:  Pilot boards 2 n.m. from the channel entrance.
ANCHORAGES:  Waiting…