Home > Port
 

Contents

Pre Arrival:  Overview | Location | Charts | Documents   ...
Arrival:  Approaches | Pilotage | Anchorages
Communications:  Pratique | VHF
Berthing Ops:  Tugs | Berths
Cargo:  Bulk | Cranes | Stevedores
Facilities:  Medical | Water | Fuel | Repairs | Surveyors
Security:  Police etc | Security
Shore:  Consuls | Airport | Customs
Misc:  Authority

Summary

Max. Size:  Channel:  Draft 11.58 m. (tidal). Bulk:  Depth 11.58 m. (tidal).
Fuel:  Available at 24 hours' notice.
Airport:  Reus Int'l, 97 km. Barcelona Int'l, 196 km.
Medical:  Facilities available.
Alcanar
Flag of Spain
View weather forecast

ESACA

OVERVIEW:  Cement production plant operated by Cemex Espana. Handles cement production of 2.18 million tonnes/year and clinker production of 1.8 million tonnes/year
LOCATION:  80 n.m. NNE of Valencia and 87 n.m. SW of Barcelona.
CHARTS:  BA Chart No. 1515.
Publications:  BA Mediterranean Pilot, Vol. 1, NP 45.
DOCUMENTS: 
3 Cargo Manifests or Master/Ballast Declaration
1 Crew Effects Declaration
3 Crew Lists
3 Passenger (Nil) Lists
1 Stores List
Certificates: 
1 International Load Line Certificate
1 International Tonnage Certificate
1 IOPP Certificate
1 Registry Certificate
1 Ship Sanitation Control (Exemption) Certificate
MAX. SIZE:  Channel:  Draft 11.58 m. (tidal).
Bulk:  Depth 11.58 m. (tidal).
APPROACHES:  Entry/Departure Channel:  Channel is about 3 n.m. long and 76 m. (250 ft.) wide, maximum draft is 11.58 m., straight and lies 328°(T) from Fairway Buoy. There are 10 pairs of buoys marking both channel sides.
PILOTAGE:  Compulsory and service provided from Sant Carles de la Rapita.